[![Power Control Engineers](https://blog.pceng.com.au/hubfs/PowerControlEngineers_July2018/Images/logo.png)](http://www.pceng.com.au/news/)

- [Home](http://www.pceng.com.au/)
- [About](http://www.pceng.com.au/about/)
- [Services](http://www.pceng.com.au/services/) 
    - [Consulting](http://www.pceng.com.au/services/consulting/)
    - [Analysis](http://www.pceng.com.au/services/analysis/)
    - [Design](http://www.pceng.com.au/services/design/)
    - [Management](http://www.pceng.com.au/services/management/)
    - [Support](http://www.pceng.com.au/services/support/)
- [News](http://www.pceng.com.au/news/)
- [Projects](http://www.pceng.com.au/case-studies/) 
    - [Case Study - Statutory Mines Role](http://www.pceng.com.au/case-studies/case-study-statutory-mines-role/)
- [White Papers](http://www.pceng.com.au/white-papers/) 
    - [Arcflash: Some Practical Steps](http://www.pceng.com.au/white-papers/arcflash-some-practical-steps/)
    - [Connecting to the Grid](http://www.pceng.com.au/white-papers/connecting-to-the-grid/)
    - [High Voltage Customer Obligations](http://www.pceng.com.au/white-papers/high-voltage-customer-obligations/)
    - [Mine Statutory Requirements White Paper](http://www.pceng.com.au/white-papers/mine-statutory-requirements-white-paper/)
    - [Power System Quality using Large Scale Energy Storage](http://www.pceng.com.au/white-papers/power-quality-using-large-scale-energy-storage/)
    - [High Voltage Maintenance](http://www.pceng.com.au/white-papers/high-voltage-maintenance/)
    - [Electrical Failure Investigation](http://www.pceng.com.au/white-papers/electrical-failure-investigation/)
    - [Hazardous Area Product Certification](http://www.pceng.com.au/white-papers/hazardous-area-product-certification/)
- [Contact](http://www.pceng.com.au/contact/)

- [Home](http://www.pceng.com.au/)
- [About](http://www.pceng.com.au/about/)
- [Services](http://www.pceng.com.au/services/) 
    - [Consulting](http://www.pceng.com.au/services/consulting/)
    - [Analysis](http://www.pceng.com.au/services/analysis/)
    - [Design](http://www.pceng.com.au/services/design/)
    - [Management](http://www.pceng.com.au/services/management/)
    - [Support](http://www.pceng.com.au/services/support/)
- [News](http://www.pceng.com.au/news/)
- [Case Studies](http://www.pceng.com.au/case-studies/) 
    - [Case Study - Statutory Mines Role](http://www.pceng.com.au/case-studies/case-study-statutory-mines-role/)
- [White Papers](http://www.pceng.com.au/white-papers/) 
    - [Arcflash: Some Practical Steps](http://www.pceng.com.au/white-papers/arcflash-some-practical-steps/)
    - [Connecting to the Grid](http://www.pceng.com.au/white-papers/connecting-to-the-grid/)
    - [High Voltage Customer Obligations](http://www.pceng.com.au/white-papers/high-voltage-customer-obligations/)
    - [Mine Statutory Requirements White Paper](http://www.pceng.com.au/white-papers/mine-statutory-requirements-white-paper/)
    - [Power System Quality using Large Scale Energy Storage](http://www.pceng.com.au/white-papers/power-quality-using-large-scale-energy-storage/)
    - [High Voltage Maintenance](http://www.pceng.com.au/white-papers/high-voltage-maintenance/)
    - [Electrical Failure Investigation](http://www.pceng.com.au/white-papers/electrical-failure-investigation/)
    - [Hazardous Area Product Certification](http://www.pceng.com.au/white-papers/hazardous-area-product-certification/)
- [Contact](http://www.pceng.com.au/contact/)

# PCE Newsroom

## [PCE ACHIEVES INTEGRATED MANAGEMENT SYSTEM (IMS) CERTIFICATION](https://blog.pceng.com.au/pce-achieves-pas99-integrated-management-system-ims-certification)

## [AUSGRID REVISES NETWORK STANDARD NS220 - OVERHEAD DESIGN MANUAL](https://blog.pceng.com.au/ausgrid-network-standard-ns220-overhead-design-manual-undergoes-major-review)

## [POWER QUALITY MONITORING - QUALITY DATA IN, QUALITY PROJECTS OUT](https://blog.pceng.com.au/power-quality-monitoring-pqm-quality-data-in-quality-projects-out)

## [GENERATOR CIRCUIT BREAKERS & OUT OF PHASE SWITCHING](https://blog.pceng.com.au/large-generator-circuit-breakers-out-of-phase-switching)

## [CHALLENGES OF INTEGRATING DISTRIBUTED AND RENEWABLE ENERGY RESOURCES WITH THE GRID](https://blog.pceng.com.au/challenges-of-integrating-distributed-and-renewable-energy-resources-with-the-grid)

## [ENERGY SYSTEM OPTIMISATION - GETTING YOUR ASSETS RACE READY](https://blog.pceng.com.au/energy-system-optimisation-getting-your-assets-race-ready)

## [PARTIAL DISCHARGE - STAYING AHEAD OF THE GAME](https://blog.pceng.com.au/partial-discharge-stay-ahead-of-the-game)

## [AUSGRID UPDATE APPLICATION PROCESS, INTRODUCE NEW CRM TOOL](https://blog.pceng.com.au/ausgrid-update-application-process-introduce-new-crm-tool)

## [IEEE 1584-2018; what 2000 additional tests and over 15 years of research has taught us about Arc-Flash Hazard Calculation](https://blog.pceng.com.au/ieee-1584-2018-what-2000-additional-tests-and-over-15-years-of-research-has-taught-us-about-arc-flash-hazard-calculation)

## [AUSGRID TO UPDATE FEE STRUCTURE AND MORE](https://blog.pceng.com.au/power-control-engineers-take-hold-of-the-future-0)

## *'We are industry-based electrical engineers * *providing practical power solutions; * *rolling up our sleeves since 2003'*

### Subscribe Here!

### Recent Posts

### Posts by Tag

- [PCE Newsroom (6)](https://blog.pceng.com.au/tag/pce-newsroom)
- [Electrical Engineering (4)](https://blog.pceng.com.au/tag/electrical-engineering)
- [Protection (2)](https://blog.pceng.com.au/tag/protection)
- [Renewable Integration (2)](https://blog.pceng.com.au/tag/renewable-integration)
- [Compliance (1)](https://blog.pceng.com.au/tag/compliance)
- [Insider (1)](https://blog.pceng.com.au/tag/insider)
- [power quality monitoring (1)](https://blog.pceng.com.au/tag/power-quality-monitoring)

See all

![Question mark inside a speech bubble](https://blog.pceng.com.au/hubfs/PowerControlEngineers_July2018/Images/question-icon.png)

Have a question or need a custom quote?

[Enquire Now](http://www.pceng.com.au/contact/)

![Power Control Engineers](https://blog.pceng.com.au/hubfs/PowerControlEngineers_July2018/Images/footer-logo.png)

Power Control Engineers is a Newcastle based design, consulting and project management company specialising in electrical power engineering. We provide services to the mining, manufacturing and power industries.

### Quick Links

- [Consulting](http://www.pceng.com.au/services/consulting/)
- [Analysis](http://www.pceng.com.au/services/analysis/)
- [Design](http://www.pceng.com.au/services/design/)
- [Management](http://www.pceng.com.au/services/management/)
- [Support](http://www.pceng.com.au/services/support/)
- [About](http://www.pceng.com.au/about/)
- [Contact](http://www.pceng.com.au/contact/)

### Head Office

Tel: [02 4961 3344](tel:02%204961%203344)  
Fax:   
E-mail: [info@pceng.com.au](mailto:info@pceng.com.au)

51 Darling Street Carrington, NSW 2294,  
ABN 501 0368 4466

[Show on Map](https://www.google.com.au/maps/place/51%20Darling%20Street%20%20Carrington,%20NSW%202294,%20ABN%20501%200368%204466/)

### Perth Office

Tel: [0419 915 820](tel:0419%20915%20820)  
E-mail: [infowa@pceng.com.au](mailto:infowa@pceng.com.au)

66 Carmel Road,  
Carmel, WA 6076

[Show on Map](https://www.google.com.au/maps/place/66%20Carmel%20Road,%20Carmel,%20WA%206076/)

© 2018 Power Control Engineers, All rights reserved

Social Networks: <https://www.linkedin.com/company/power-control-engineers-pty-ltd>