---
title: | Don Carbarns
description: Don is a chartered electrical engineer with over twenty-five years of electrical engineering experience across a number of different industries. He has been a practicing electrical engineer since graduating from the University of Natal in Durban, South Africa in 1979. During this period, he has worked in engineering and management positions in a number of organisations in South Africa, the UK and Australia. Don joined Power Control Engineers (PCE) in 2010 as a lead Electrical engineer. For eight years prior to this, he was employed by WorleyParsons in Newcastle as a senior electrical engineer. Most of this period was spent at the Hunter’s two Aluminium smelters, first at Tomago and then at Hydro Aluminium. Earlier career experience was centred on the Chemical Industry including AECI South Africa, ICI plc (UK) and ICI Australia Botany Operations.
---

[![Power Control Engineers](https://blog.pceng.com.au/hubfs/PowerControlEngineers_July2018/Images/logo.png)](http://www.pceng.com.au/news/)

- [Home](http://www.pceng.com.au/)
- [About](http://www.pceng.com.au/about/)
- [Services](http://www.pceng.com.au/services/) 
    - [Consulting](http://www.pceng.com.au/services/consulting/)
    - [Analysis](http://www.pceng.com.au/services/analysis/)
    - [Design](http://www.pceng.com.au/services/design/)
    - [Management](http://www.pceng.com.au/services/management/)
    - [Support](http://www.pceng.com.au/services/support/)
- [News](http://www.pceng.com.au/news/)
- [Projects](http://www.pceng.com.au/case-studies/) 
    - [Case Study - Statutory Mines Role](http://www.pceng.com.au/case-studies/case-study-statutory-mines-role/)
- [White Papers](http://www.pceng.com.au/white-papers/) 
    - [Arcflash: Some Practical Steps](http://www.pceng.com.au/white-papers/arcflash-some-practical-steps/)
    - [Connecting to the Grid](http://www.pceng.com.au/white-papers/connecting-to-the-grid/)
    - [High Voltage Customer Obligations](http://www.pceng.com.au/white-papers/high-voltage-customer-obligations/)
    - [Mine Statutory Requirements White Paper](http://www.pceng.com.au/white-papers/mine-statutory-requirements-white-paper/)
    - [Power System Quality using Large Scale Energy Storage](http://www.pceng.com.au/white-papers/power-quality-using-large-scale-energy-storage/)
    - [High Voltage Maintenance](http://www.pceng.com.au/white-papers/high-voltage-maintenance/)
    - [Electrical Failure Investigation](http://www.pceng.com.au/white-papers/electrical-failure-investigation/)
    - [Hazardous Area Product Certification](http://www.pceng.com.au/white-papers/hazardous-area-product-certification/)
- [Contact](http://www.pceng.com.au/contact/)

- [Home](http://www.pceng.com.au/)
- [About](http://www.pceng.com.au/about/)
- [Services](http://www.pceng.com.au/services/) 
    - [Consulting](http://www.pceng.com.au/services/consulting/)
    - [Analysis](http://www.pceng.com.au/services/analysis/)
    - [Design](http://www.pceng.com.au/services/design/)
    - [Management](http://www.pceng.com.au/services/management/)
    - [Support](http://www.pceng.com.au/services/support/)
- [News](http://www.pceng.com.au/news/)
- [Case Studies](http://www.pceng.com.au/case-studies/) 
    - [Case Study - Statutory Mines Role](http://www.pceng.com.au/case-studies/case-study-statutory-mines-role/)
- [White Papers](http://www.pceng.com.au/white-papers/) 
    - [Arcflash: Some Practical Steps](http://www.pceng.com.au/white-papers/arcflash-some-practical-steps/)
    - [Connecting to the Grid](http://www.pceng.com.au/white-papers/connecting-to-the-grid/)
    - [High Voltage Customer Obligations](http://www.pceng.com.au/white-papers/high-voltage-customer-obligations/)
    - [Mine Statutory Requirements White Paper](http://www.pceng.com.au/white-papers/mine-statutory-requirements-white-paper/)
    - [Power System Quality using Large Scale Energy Storage](http://www.pceng.com.au/white-papers/power-quality-using-large-scale-energy-storage/)
    - [High Voltage Maintenance](http://www.pceng.com.au/white-papers/high-voltage-maintenance/)
    - [Electrical Failure Investigation](http://www.pceng.com.au/white-papers/electrical-failure-investigation/)
    - [Hazardous Area Product Certification](http://www.pceng.com.au/white-papers/hazardous-area-product-certification/)
- [Contact](http://www.pceng.com.au/contact/)

# PCE Newsroom

## Don Carbarns

![Don Carbarns](https://blog.pceng.com.au/hubfs/don.png)

Don is a chartered electrical engineer with over twenty-five years of electrical engineering experience across a number of different industries. He has been a practicing electrical engineer since graduating from the University of Natal in Durban, South Africa in 1979. During this period, he has worked in engineering and management positions in a number of organisations in South Africa, the UK and Australia. Don joined Power Control Engineers (PCE) in 2010 as a lead Electrical engineer. For eight years prior to this, he was employed by WorleyParsons in Newcastle as a senior electrical engineer. Most of this period was spent at the Hunter’s two Aluminium smelters, first at Tomago and then at Hydro Aluminium. Earlier career experience was centred on the Chemical Industry including AECI South Africa, ICI plc (UK) and ICI Australia Botany Operations.

Find me on:

<https://www.linkedin.com/company/2562793/>

### Recent Posts

[![](https://blog.pceng.com.au/hubfs/Image%202.png)](https://blog.pceng.com.au/large-generator-circuit-breakers-out-of-phase-switching)

## [GENERATOR CIRCUIT BREAKERS & OUT OF PHASE SWITCHING](https://blog.pceng.com.au/large-generator-circuit-breakers-out-of-phase-switching)

 Apr 15, 2020 4:03:35 PM [Don Carbarns](https://blog.pceng.com.au/author/don-carbarns)

Large Generator Circuit Breakers are like no others.  With ratings to match generators of 1000MW or more, they are massive devices with continuous current ratings in excess of 25,000A at voltages of the order of 24 - 36kV.  Currents of this magnitude would be considered to be fault currents in any other environment.

[Read More](https://blog.pceng.com.au/large-generator-circuit-breakers-out-of-phase-switching)

[All posts](https://blog.pceng.com.au/all)

## *'We are industry-based electrical engineers * *providing practical power solutions; * *rolling up our sleeves since 2003'*

### Subscribe Here!

### Recent Posts

### Posts by Tag

- [PCE Newsroom (6)](https://blog.pceng.com.au/tag/pce-newsroom)
- [Electrical Engineering (4)](https://blog.pceng.com.au/tag/electrical-engineering)
- [Protection (2)](https://blog.pceng.com.au/tag/protection)
- [Renewable Integration (2)](https://blog.pceng.com.au/tag/renewable-integration)
- [Compliance (1)](https://blog.pceng.com.au/tag/compliance)
- [Insider (1)](https://blog.pceng.com.au/tag/insider)
- [power quality monitoring (1)](https://blog.pceng.com.au/tag/power-quality-monitoring)

See all

![Question mark inside a speech bubble](https://blog.pceng.com.au/hubfs/PowerControlEngineers_July2018/Images/question-icon.png)

Have a question or need a custom quote?

[Enquire Now](http://www.pceng.com.au/contact/)

![Power Control Engineers](https://blog.pceng.com.au/hubfs/PowerControlEngineers_July2018/Images/footer-logo.png)

Power Control Engineers is a Newcastle based design, consulting and project management company specialising in electrical power engineering. We provide services to the mining, manufacturing and power industries.

### Quick Links

- [Consulting](http://www.pceng.com.au/services/consulting/)
- [Analysis](http://www.pceng.com.au/services/analysis/)
- [Design](http://www.pceng.com.au/services/design/)
- [Management](http://www.pceng.com.au/services/management/)
- [Support](http://www.pceng.com.au/services/support/)
- [About](http://www.pceng.com.au/about/)
- [Contact](http://www.pceng.com.au/contact/)

### Head Office

Tel: [02 4961 3344](tel:02%204961%203344)  
Fax:   
E-mail: [info@pceng.com.au](mailto:info@pceng.com.au)

51 Darling Street Carrington, NSW 2294,  
ABN 501 0368 4466

[Show on Map](https://www.google.com.au/maps/place/51%20Darling%20Street%20%20Carrington,%20NSW%202294,%20ABN%20501%200368%204466/)

### Perth Office

Tel: [0419 915 820](tel:0419%20915%20820)  
E-mail: [infowa@pceng.com.au](mailto:infowa@pceng.com.au)

66 Carmel Road,  
Carmel, WA 6076

[Show on Map](https://www.google.com.au/maps/place/66%20Carmel%20Road,%20Carmel,%20WA%206076/)

© 2018 Power Control Engineers, All rights reserved

Social Networks: <https://www.linkedin.com/company/power-control-engineers-pty-ltd>